datacentergrid.dev
AI Data Center Power PRIMARY-SOURCE WAREHOUSE UPDATED 2026-10-19

Behind-the-Meter AI Power Index

Primary-source index of behind-the-meter generation and public offtake for AI data centers

Canonical Definition 14 Verified Records · 91 Comparisons

Behind-the-meter AI power is generation sited at a data center, including gas turbines, gas engines, fuel cells, and microgrids, plus public offtake contracts that dedicate plant output to computing load. Talen's 11 June 2025 agreement supplies Amazon 1,920 megawatts from Susquehanna through 2042. Entergy plans seven gas plants above 5,200 megawatts.

Talen–Amazon full PPA
1,920 MW
Source: Talen release, 11 June 2025
Entergy–Meta new gas
5,200+ MW
Source: Entergy release, 27 March 2026
VoltaGrid BTM engines
1.5 GW
Source: INNIO release, 11 February 2026
HyperFrames Data Briefing

60-Second Technical Overview & Benchmark Walkthrough

Direct MP4 (/demo.mp4)

Verified Behind-the-Meter AI Power Index Matrix (14 of 14 Tracked)

Backed by SQLite warehouse (warehouse/warehouse.db) · Last 30 days sensor verified

Entity / Implementation Organization Status Key Technical Metric Governance / License Verification
Talen Amazon Susquehanna Offtake

Talen will supply Amazon 1,920 MW from Susquehanna through 2042, shifting the campus front-of-meter in spring 2026.

Talen Energy PPA through 2042 1,920 MW full quantity Expanded nuclear PPA reported
Crane Microsoft PPA Offtake

Constellation signed a 20-year Microsoft PPA to restart Three Mile Island Unit 1, adding about 835 MW in 2028.

Constellation Restart targeted 2028 About 835 MW 20-year nuclear PPA reported
Vistra Meta PJM PPAs Offtake

Vistra's 20-year Meta PPAs cover 2,176 MW operating plus 433 MW of uprates, reaching 2,609 MW in 2034.

Vistra Purchases from late 2026 2,609 MW by 2034 20-year nuclear PPAs reported
Entergy Meta Richland Utility build

Entergy plans seven gas combined-cycle plants, more than 5,200 MW, paid for by Meta at Richland Parish.

Entergy Louisiana Agreement announced 5,200+ MW new gas Full cost-of-service deal reported
Colossus Memphis Turbines On-site gas

Colossus uses a 150 MW MLGW substation and keeps 15 gas turbines plus more than 240 batteries for outages.

SpaceXSI Grid supply, turbine backup 15 backup gas turbines Company facility FAQ reported
VoltaGrid INNIO 1.5 GW On-site gas

INNIO will supply VoltaGrid 300 Jenbacher engines, 1.5 GW in 25 MW units, for U.S. data centers by 2028.

INNIO Group Delivery by 2028 1.5 GW, 300 engines Behind-the-meter order reported
VoltaGrid INNIO 2.3 GW On-site gas

INNIO's largest order gives VoltaGrid 2.3 GW as 92 Jenbacher power packs of 25 MW for AI data centers.

INNIO Group Order announced 2.3 GW, 92 packs Data-center power order reported
Crusoe LM2500XPRESS On-site gas

Crusoe ordered 29 GE Vernova LM2500XPRESS turbines, nearly 1 GW, with 19 of the units booked in June 2025.

Crusoe 29 units ordered Nearly 1 GW GE Vernova turbine order reported
APR Mobile Gas Turbines On-site gas

New APR Energy is deploying four mobile gas turbines, 100 MW+, behind the meter for a U.S. AI hyperscaler.

New APR Energy Deployment announced 100 MW+ from 4 turbines Behind-the-meter deployment reported
Twenty20 Frame 5 Order On-site gas

Baker Hughes will supply Twenty20 Energy 10 Frame 5 turbines, up to 250 MW, for Georgia and Texas data centers.

Baker Hughes Deliveries in 2027 Up to 250 MW Frame 5 turbine award reported
Monarch Compute Campus Microgrid

AIP ordered 2 GW of Caterpillar gas gensets for Monarch, a behind-the-meter West Virginia microgrid, online in 2027.

American Intelligence & Power 2 GW ordered 2 GW gas gensets West Virginia microgrid reported
Bloom Equinix Fuel Cells Fuel cell

Bloom says Equinix onsite fuel cells now exceed 100 MW, with about 75 MW running and 30 MW under construction.

Bloom Energy About 75 MW operating Exceeds 100 MW On-site fuel-cell deal reported
AEP Bloom Fuel Cells Fuel cell

AEP secured up to 1 GW of Bloom fuel cells, sited at customers and designed not to export power to the grid.

American Electric Power Customer deals pending Up to 1 GW secured Customer-sited, no export reported
Oracle Bloom Onsite Power Fuel cell

Bloom will place fuel cells at select U.S. OCI data centers and says it can power a full site within 90 days.

Bloom Energy Deployment announced Onsite power in 90 days OCI fuel-cell collaboration reported

Featured Head-to-Head Comparisons

Every pair of the 14 records (91 total pairs) has a static comparison page. These 6 are the highest-intent matches.

Frequently Asked Questions

What counts as behind-the-meter power in this index?

On-site generation that serves the data center directly. Caterpillar's Monarch release calls the campus fully self-supplied, with no incremental utility delivery for its load. AEP's Bloom fuel cells are customer-sited and designed not to send energy back to the grid.

What is the largest nuclear offtake in the index?

Vistra's 9 January 2026 release says 20-year PPAs with Meta reach 2,609 MW in 2034, including 2,176 MW from operating Perry and Davis-Besse units and 433 MW of uprates. Those plants keep delivering electricity to the PJM grid.

How large is the Talen and Amazon Susquehanna contract?

Talen's 11 June 2025 release says the expanded PPA supplies 1,920 MW at full quantity through 2042, with full volume expected no later than 2032. The existing co-located load becomes front-of-the-meter in spring 2026, and PPL Electric Utilities delivers the power.

Which on-site gas orders are recorded?

VoltaGrid's INNIO orders are 1.5 GW (300 Jenbacher engines, delivery by 2028) and 2.3 GW (92 packs of 25 MW). Crusoe ordered 29 LM2500XPRESS turbines, nearly 1 GW. Monarch ordered 2 GW of Caterpillar G3516 gensets. Twenty20 ordered 10 Frame 5 turbines, up to 250 MW. New APR Energy is deploying four mobile turbines at 100 MW+.

How is each figure checked?

Every row has one source URL. A reported record is taken from a company release or facility page retrieved on 2026-10-19. The number, date, and company on that row appear on that page. Secondary news is not used as a source.

Where can the dataset be downloaded?

The JSON dataset is at https://datacentergrid.dev/data/dataset.json, the CSV at https://datacentergrid.dev/data/dataset.csv, and the ARD v1.0 manifest at https://datacentergrid.dev/.well-known/ard.json.